1. The cold start machine must have preheating measures. The Force provides files for preheating. The preheating time is determined by the external temperature. It is generally 5 minutes in summer and autumn, and 10 minutes in winter and spring.
2. The main problems of the main axis are as follows:
(1)The air pressure is less than 7 kg force, if it is insufficient, a booster pump must be installed.
(2)Tool holders, knives, latin, nuts, and chucks should be replaced in time.
(3)The air source entering the machine must be dried. The water in the gas tank must be waterproofed on time every day.
(4)Minimize misoperation and damage to the spindle.
(5)If there is a problem, you must follow the process to solve the problem.
(6)Do not have a tool holder on the spindle every day after get off work.
(7)Maintenance of the tool holder, the spindle and the Latin position are wiped with a non-woven cloth moistened with alcohol.
(8) Do not use an air gun to blow the dust on the spindle, it is best to use a vacuum cleaner to suck it.
3. The bearing on the screw rod is added once every half a month.
Fourth, the whole machine should keep the guide rails and screw rods with a sense of oil stains.
5. U disk copy files must be free of viruses.
6. Do not pick up materials when the machine is running.
7. Pay attention to the cleanliness of the machine when handing over shifts every day, and report any problems in time for handling.